With the weather slowly changing across the day from looming clouds to glorious sunshine the efforts of backfilling Trench 1 are well under way. This morning the remains of the trench that we had all worked hard on were still visible, and by this afternoon the resulting trench looks more like its former self three weeks previously. All day we have been digging along side the mini-excavator, which happened to break down half way through the day, and to be honest we are all shattered. I don’t think any of us will have trouble getting to sleep tonight.
Callum Allsop – Student Volunteer
No comments:
Post a Comment